Check Point 61000 Manual de servicio Pagina 26

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 47
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 25
Inserting Front Blank Panels
Inserting QSFP Splitters
1. Insert the QSFP transceiver into the Security Switch Module.
2. Insert the QSFP splitter cable into the transceiver.
This converts the 40GbE QSPF port to 4 10GbE ports.
Inserting Front Blank Panels
Blank panels contain cooled air in the appliance. Use the blank panels to close open slots.
To Insert a blank Panel at the front:
1. Insert the blank panel into the open slot.
2. Tighten the two tumble screws.
Note - Rear blank panels are pre-installed on the chassis.
Connecting a Second Chassis
If you have a dual chassis environment (for chassis high availability):
For the second chassis, repeat steps 1-3
Connect the second chassis
On each SSM, connect the sync ports to the same sync ports on the backup chassis.
Vista de pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 46 47

Comentarios a estos manuales

Sin comentarios